Type C Alu Formwork

Type C Alu Formwork

In the construction industry, Aluminium Formwork is the latest type of technology that improves the overall efficiency and reduces the cost of the project. It is a temporary structure that is built around the perimeter of a construction site to create a mould for pouring concrete. Once poured, the concrete hardens and creates a permanent structure.
Send Inquiry

Description

Technical Parameters

The Best Type C Alu Formwork Manufacture!

 

Shandong Hualv Alu-Formwork Co., Ltd. was established in 2017. It is affiliated with Shandong Huajian Aluminum Group and is located in Linqu County, the capital of China's aluminum industry. We are an enterprise that integrates aluminum alloy formwork profile research and development, aluminum alloy formwork structure design, aluminum alloy formwork mold design, and aluminum alloy formwork processing and production.

 

Why Choose Us

One-stop Solution

With rich experience and one-to-one service,we can help you choose products and answer technical questions.

World-wide expertise

We know international markets and trends. Our expertise, experience and network cover all corners of the world.

Commitment to quality

We're committed to quality and concrete actions. That means we always deliver solutions in a professional and practical way.

 

 

Customer Satisfaction

Providing after-sales services can enhance customer satisfaction by ensuring that customers' needs are met even after the purchase. This can lead to increased customer loyalty and positive word-of-mouth referrals.

 

Form Aluminium Formwork

Form Aluminium Formwork

Form aluminium formwork is made of aluminum alloy welding and forging, it is a new type of green building formwork, which mainly consists of panels (standard and non-standard panels), support structures, connectors and fasteners.

Aluminium Shuttering

Aluminium Shuttering

Aluminium shuttering is vertical wall components for buildings. Bearing capacity of 60KN/M2, easy turnover, is the main component of aluminum alloy template.Template border thickness 65m,Panel 4mm, made of integrated profiles.The weight is 25KG per square.

Exterior Wall Aluminum Formwork

Exterior Wall Aluminum Formwork

Exterior wall aluminum formwork is used for vertical construction of the external wall formwork of the building to make a working construction surface on the external wall.

Wall End Aluminum Formwork

Wall End Aluminum Formwork

Wall end aluminum formwork is a special design of aluminum formwork products, mainly used in the construction of building walls in the end and corner parts, such as: wall end, beam bottom, door head window cover and so on.

product-750-750

Aluminum Formwork Support

Aluminum formwork support mainly used for the end of the wall, the bottom of the beam, the window sill cover and other parts of the door, supporting and fixing the aluminum template base to increase the flange

Aluminum Formwork Keel

Aluminum Formwork Keel

Aluminum formwork keel is an important accessory in the aluminum formwork system, which is mainly used to support and fix the aluminum formwork to ensure the stability and accuracy of the formwork position during the construction process.

Aluminum Formwork Support Connection Strips

Aluminum Formwork Support Connection Strips

Aluminum formwork support connection strips designed for aluminum formwork systems are used to connect and support aluminum formwork systems, where the connection bars play a key role in ensuring a solid connection between the formwork and the stability of the overall structure.

Roof Corner C-shaped Aluminum Formwork

Roof Corner C-Shaped Aluminum Formwork

Roof corner C-shaped aluminum formwork is a special formwork for the corner of the roof in the building formwork project, bearing capacity of 60KN/M2, easy turnover, is the main component of aluminum alloy formwork. The thickness of the template border is 65m, and the panel is 4mm. It is made of integrated profiles.

L-Shaped Aluminium Angle For Construction

L-Shaped Aluminium Angle For Construction

L-Shaped Aluminium Angle for Construction is used for aluminum formwork connection at the positive corner of buildings. Bearing capacity of 60KN/M2, easy turnover, is the main component of aluminum alloy formwork at the positive corner. Template frame thickness 65m, panel 4mm, made of integrated profiles, weight per square 25KG.

 

What is Type C Alu Formwork

 

In the construction industry, Aluminium Formwork is the latest type of technology that improves the overall efficiency and reduces the cost of the project. It is a temporary structure that is built around the perimeter of a construction site to create a mould for pouring concrete. Once poured, the concrete hardens and creates a permanent structure.

 

Benefits of Type C Alu Formwork

 

Short construction period. The aluminum formwork system is a quick-release formwork system. The normal construction of a set of formwork can reach one level in four days, and the pipeline construction can be better carried out, which greatly improves the construction progress and saves management costs.


There are many times of repeated use, and the average use cost is low. The aluminum formwork system uses the aluminum alloy profile formed by the overall extrusion as the raw material, and a set of formwork can be used over 300 times for standard construction. The purchase price of a set of templates is amortized, which saves a lot of cost than traditional templates.


Convenient construction and high efficiency. The aluminum formwork system is simple and convenient to assemble, with an average weight of about 20kg. It is completely handled and assembled by hand without the assistance of any mechanical equipment. Moreover, the system design is simple, and the workers can get up to speed quickly. Skilled installers can install 20-30 square meters per person per day, greatly saving labor costs.


Good stability and high bearing capacity. The bearing capacity of most aluminum formwork systems can reach 60KN per square meter, which is sufficient to meet the supporting capacity requirements of most residential building groups.


Wide range of applications. Aluminum formwork is suitable for the use of walls, horizontal floors, columns, beams, stairs, windowsills, flaps, etc., and it is also useful for secondary structural support such as ring beams, structural columns, and anti-bumps.


Less joints, high precision, good concrete surface effect after demoulding. After demolishing the aluminum building formwork, the surface quality of the concrete is smooth and smooth, which can basically meet the requirements of facing and clear concrete, without the need for batching, which can save the batching costs.


The construction site has less waste and the supporting system is simple. Aluminium Formwork Accessories can be reused. After the construction is demolished, there is no garbage on site. The support system has a simple structure and is easy to remove. Therefore, the entire construction environment is safe, clean and tidy.


Strong standard and universality. There are many specifications of aluminum formwork, which can be assembled with different specifications according to the project. When the used formwork is used to rebuild a new building, only about 20 non-standard boards need to be replaced, which can reduce costs.


High recycling value. After the aluminum formwork is discarded, when the residual value of the waste treatment is high, the cost sharing advantage is obvious.


Low carbon emission reduction. All materials of the aluminum formwork system are renewable materials, which meet the national regulations on energy conservation, environmental protection, low carbon and emission reduction of construction projects. 

 

Aluminum Formwork Support Connection Strips

 

Compare construction quality of wood formwork with aluminum formwork

The traditional deviation value of wood formowork is more than 10 mm, easy to deformation, especially the outer column, wood formwork reinforcement point is wide, and easy to "run", need to have a technical level of pure wood formwork workers.


Because the wood formwork is poorly made and the number of times of use reaches more than 3 times because the joint has cement and sand, etc., it often needs to be corrected. Deformation and expansion are easy to occur after water absorption, and the accuracy cannot be achieved, at least beyond the deviation of 15mm.


In contrast, the aluminum formwork component size deviation value is between millimeters, the root positioning of the aluminum formwork column is fixed by welding, the verticality of the laser instrument, accurate to 5mm, the junction of the upper and lower layer has a concrete fixed shared module, not easy to wrong platform; And in the process of casting, if the reinforcement is not in place, it is easy to "run the mold", resulting in the wrong platform.

 

Questions about aluminium formwork construction

 

Question: The strength of aluminium formwork profile may not meet the requirements and they are prone to deformation during the construction process.


Solve: Prior to installation, it is imperative to conduct a strength acceptance test on the aluminium formwork profile to ensure its compliance with prescribed standards. It is recommended to employ aluminium materials from the 5-series or 6-series due to their heightened strength and durability.acceptance tests should be conducted on weld seams, joint widths, pins and wedges. Weld seams need to undergo a thorough inspection of welding processes and quality to ensure strong and reliable joints. Joint widths should conform to design requirements to avoid construction difficulties or quality issues caused by excessive or insufficient widths. The quality and dimensions of pins and wedges should also be verified to ensure the effective connection of components of aluminium formwork.

 

Question: The aluminium formwork system might suffer from inadequate overall rigidity due to the large number of small panels used in construction.


Solve: The aluminium formwork system(aluminium formwork system) is assembled with aluminium alloy plates to form a complete framework, featuring a high bearing capacity reaching 30-40kn per square meter. However, the use of a large number of small plates may result in inadequate overall rigidity, leading to structural deformation. During the aluminium formwork design calculation, non-standard formworks design should be attention such as beam-column and beam-wall joints as well as the formwork design for the lower edges of wall corners to optimize the overall structural rigidity and reduce the risk of deformation.

 

Question: The concrete surface detachment after the formwork for aluminium was dismantled


Solve: Before using formwork for aluminium, it is essential to apply form release agents every time. This practice effectively prevents adhesion between concrete and formwork for aluminium, ensuring a smooth concrete surface during dismantling. We recommend choosing a water-based form release agent as it is environmentally friendly and easy to clean. When applying the form release agent, it should be brushed from top to bottom. This method ensures thorough penetration of the release agent and minimizes waste and ineffectiveness during application.

 

Question: During aluminium formwork in construction, leakage at the joints will result in honeycombing on the surface of the concrete, which seriously affects the appearance of the structure.


Solve: In aluminium formwork in construction, if the cement residue is not properly cleaned or if the joints are not tightly sealed, it may lead to leakage. Therefore, immediate cleaning is necessary after the removal of aluminium formwork panels. The purpose of cleaning aluminium formwork panels is to ensure optimal construction results and prevent the occurrence of grout leakage issues during future use. The cleaning process involves the thorough removal of residual cement and other contaminants from the edges, as well as addressing any joint-related concerns. Furthermore, any deformed or damaged used aluminium formwork should be promptly sent back to the manufacturer for repairs, in order to prolong its service life and reduce subsequent maintenance costs.

 

Question: the columns, walls, and stairs were displacement.


Solve: If the displacement is within the allowed range (≤5mm for columns and ≤3mm for walls), no further treatment is needed. If the displacement exceeds the allowed range (5mm ≤ column ≤25mm and 3 mm ≤ wall ≤15mm), To address this issue, it is possible to install kicker in aluminium formwork, which should be affixed to the structure. When dismantling the lower wall panels, it is crucial to refrain from removing kicker in aluminium formwork.

 

Major Components of Aluminium Formwork

Panels

Panels act as the main load-bearing parts and come in various types to serve different purposes. Wall panels are the most commonly used and contain tie rod holes for the construction of walls. Wall top panels are utilized for the tops of walls. Column panels form the molds for column construction. Crane-way panels provide paths for cranes to travel on during high-rise building works.

 

Connectors

Connectors play a vital joining role. External joint connectors fix panels on the outside of structures. Internal joint connectors are used between adjacent panels from inside. Beam corner joints connect wall and beam panels at angled positions. The sturdy designs of these connectors guarantee panels are firmly interlocked and free of gaps or misalignment.

 

Bracing

Temporary bracing elements provide crucial stability to support beams, roofs, and more during construction. Kicker braces support the base of beams. Soffit braces are attached to slab undersides. Semi-circular rocker braces resist uneven loading on curved structures. The adjustable bracing connections conform to irregular profiles and deliver maximum safety even under high load conditions.

 

 

Our Factory
 

Our company covers an area of more than 180 acres, with a production plant area of more than 90,000 square meters. The annual production capacity reaches 500,000 square meters of architectural aluminum formwork. It has established in-depth cooperative relations with China Construction, China Resources, Vanke, China Overseas, Sunac, Sino-Ocean, Handa, and other companies. 

 

product-1-1

 

Certifications
 

 

product-1-1

 

FAQ

Q: Why is aluminium formwork used?

A: Unlike timber, aluminium formwork is best-suited to load-bearing wall construction as it can easily withstand high pressures from freshly poured concrete. Flexible, lightweight and easy to install, this formwork system offers a cost-effective solution that produces high-quality work every single time.

Q: How many times aluminium formwork can be used?

A: Aluminium does not rust like steel. Therefore, the aluminium formwork can be reused hundreds of times. Lightweight aluminium is easy to handle and quick to operate, and due to its rapid construction, it is highly adaptable and cost-effective.

Q: What is the thickness of aluminum formwork?

A: The panels are made from a high strength aluminium alloy with a 4mm thick skin plate and a 6mm thick ribbing behind to stiffen the panels. The panels are manufactured within factory environment.

Q: What is the curing time for formwork?

A: The standard practice is to wait a minimum of 24 hours before removing the formwork for structural walls and columns. However, the total curing time of a particular concrete structure will depend on several factors such as the ambient temperature, humidity, and the strength of the concrete mix.

Q: What is the load bearing capacity of aluminium formwork?

A: Strength & Stability High load bearing capacity of up to 60 KN per M2 when assembled. Finish quality Achieves a high quality finish after formwork removal with only minimum "skim" coat required and no heavy plastering.

Q: Is aluminium formwork better than timber formwork?

A: Reusability: Aluminium formwork is highly reusable, offering a cost-effective solution for multiple projects. Timber formwork, on the other hand, may have limited reuse potential due to wear and tear, especially in high-stress areas.

Q: When to remove formwork?

A: Formwork should only be removed when the underlying concrete is strong enough to support its own weight and loads placed on it. This is usually between 24 hours and 72 hours, depending on the type of concrete project. Some formwork is designed to be permanent.

Q: What size is aluminium formwork?

A: Aluminium Formwork Standard Panels, Size: 2400x600 mm, Dimension: 2400*600. M-FORM INDIA Is One Of The Leading Manufacturer, Supplier & Consultant of Aluminium Formwork System, MIVAN Shuttering, Formwork, Column Formwork, Slab Formwork System, Aluminium Monolithic System, Share Wall System Across Pan INDIA.

Q: What is the grade of aluminium formwork?

A: Some commonly used aluminum alloys in formwork include: 6061-T6: This is a heat-treated aluminum alloy that has good strength and corrosion resistance, making it a popular choice for structural applications. 6063-T6: This alloy has good strength and is commonly used for extrusions.

Q: Where is aluminum formwork used?

A: Aluminium formwork is a construction system for forming cast in place concrete structure of a Building. EINS Technik Formwork system provides Aluminium formwork for RCC, load-bearing, multi-storeyed buildings and enables the walls and slab to be poured in the same operation.

Q: What is the repetition of aluminium formwork?

A: Minimum 100 repetitions are desirable. enables rapid construction of multiple units of repetitive type. 2) A Slab cycle of 3 days can be achieved, which reduces the construction time considerably.

Q: What is the scrap value of aluminium formwork?

A: The average cost of aluminium scrap products ranges between 140 to 166 per kg.

Hot Tags: type c alu formwork, China type c alu formwork manufacturers, suppliers, Components Of Aluminium Formwork, Aluminum Formwork Model Room, K Plate Plastic Nut, Wall End Aluminum Formwork, Roof Corner C shaped Aluminum Formwork, K Plate Bolt And Nuts

Brand

Hualv

Grade

6061 Aluminum

Application

Commercial or industrial; modern and sophisticated building project; concrete Construction

Place of Origin

Shandong

Delivery Time

15 days

Port

Qingdao, Shanghai

Warranty

According to the actual situation

Samples

For free

MOQ

2000 sqm

Payment Terms

30% deposit before production, and balance before shipment

After-sale Service

Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts

Project Solution Capability

Graphic design, 3D model design, total solution for projects, Cross Categories Consolidation

Customization

Yes

 

Send Inquiry