Form Aluminium Formwork
video

Form Aluminium Formwork

Form aluminium formwork is made of aluminum alloy welding and forging, it is a new type of green building formwork, which mainly consists of panels (standard and non-standard panels), support structures, connectors and fasteners.
Send Inquiry

Description

Technical Parameters

Product introduction:

 

Form aluminium formwork is made of aluminum alloy welding and forging, it is a new type of green building formwork, which mainly consists of panels (standard and non-standard panels), support structures, connectors and fasteners.

 

Form aluminium formwork is now widely used in our lives, bringing a lot of conveniences to our lives. Aluminum formwork is a kind of building formwork compared to steel formwork and wooden formwork. It is made of aluminum alloy welding and forging. It is a new type of green building formwork. The aluminum formwork structure currently used in the construction of poured concrete structures is mainly composed of four parts: panels (standard and non-standard panels), supporting structures, connectors and fasteners.

 

product-800-500

 

Key points of form aluminium formwork operation and installation techniques

 

1. Preparation work before the installation of the template.

When installing aluminum formwork, design must be carried out before construction. Based on the building construction drawings and structural construction drawings, the aluminum formwork floor plan, segmented plan plan, assembly drawing of the formwork system, and formwork construction plan should be prepared. Reasonably select the model of the template to reduce the secondary processing of the template. Before installing the formwork, carefully carry out construction measurements, lay out and check, control the elevation of this floor, level the formwork, ensure that the bottom of the formwork is at the same height, set positioning steel bars on the wall, and ensure that all designed pre-embeddings are ensured before the formwork is installed. The fittings and reserved openings have been left in place, and the laying of pipelines has been completed; the steel bar binding of the end columns, corner columns, and concealed columns of the shear wall has been inspected and accepted.

2. Install aluminum wall formwork.

When installing aluminum wall formwork, the interior wall and then the exterior wall should be installed in order. After installation, the verticality and horizontal elevation should be checked. If there is any deviation, adjustments should be made in time and the cause should be found to prevent recurring problems.

3. Install supports and top edge of wall.

After the wall formwork is installed, install the diagonal supports and make preliminary adjustments to the verticality and horizontality. After the adjustment is completed, install the side formwork and corner formwork on the top of the wall.

4. Install aluminum beam formwork.

First splice it on the ground, and then install it all day long. Use corner molds on both sides to fix it on the wall formwork. When installing, first base plate and then side plate.

5. Installation of floor formwork.

Install the floor keels after all wall formwork installation and adjustments are completed. During installation, assemble them on the ground first and then install them as a whole. After the keel is installed, install the panel. First use pins to temporarily fix it, and finally tighten the pins uniformly. After the panel is installed, adjust it horizontally.

6. Remove the formwork.

After the concrete pouring is completed and the strength reaches the standard, the formwork can be dismantled. The non-load-bearing structures should be dismantled first, and then the load-bearing structures.

 

product-800-500
product-800-500

 

Our Factory:

 

product-800-800
product-800-800

 

Products:

 

product-800-900
product-800-900

 

Packing& Shipping:

 

● Package

1. We will check the product to ensure the quality, then start packing and provide pictures and videos for your reference.

2. Depending on the size and quantity of the product, we will pack the product in wooden boxes or wooden racks.

3. We will provide you with pictures after packing.

 

● Shipping

1. We will give you the corresponding shipping plan for your reference according to the address you provided

2. We will follow up with the freight forwarder and track until you receive the goods.

 

product-1600-1194

 

Hot Tags: form aluminium formwork, China form aluminium formwork manufacturers, suppliers, Roof Corner C shaped Aluminum Formwork, aluminium formwork system, Aluminum Formwork Steel Support, Wall End Aluminum Formwork, Mivan Formwork Components, Architectural Aluminum Formwork

Brand

Hualv

Grade

6061 Aluminum

Application

Commercial or industrial; modern and sophisticated building project; concrete Construction

Place of Origin

Shandong

Delivery Time

15 days

Port

Qingdao, Shanghai

Warranty

According to the actual situation

Samples

For free

MOQ

2000 sqm

Payment Terms

30% deposit before production, and balance before shipment

After-sale Service

Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts

Project Solution Capability

Graphic design, 3D model design, total solution for projects, Cross Categories Consolidation

Customization

Yes

 

Send Inquiry