Aluminum formwork short pole used for vertical reinforcement of aluminum formwork, with adjustable length and easy operation. Aluminum formwork short pole connects the root of the vertical hollow tubes of the aluminum formwork with the embedded parts of the floor and is an important component of the reinforcement system.

In order to ensure that the quality of aluminum formwork construction reaches the expected goal, quality control should be carried out from multiple aspects and stages, as follows:
1. When the aluminum formwork materials enter the site, they should be inspected and accepted as soon as possible, including pre-assembly, quality and quantity of components, and problems should be found in time. If they do not meet the project requirements, they should be returned to the factory for reprocessing.
2. Plan preparation, execution and implementation. Before the construction of the aluminum formwork, prepare the aluminum formwork construction plan. After the plan is completed, organize an exchange meeting on the acceptance standards for aluminum formwork construction to explain to the main management personnel and teams.
3. Quality control of release agent. In order to ensure the visual effect of concrete after molding and facilitate demoulding, the use of release agent is indispensable. At the same time, after the formwork is removed, the residue on the board should be cleaned in time, and the release agent should be applied after it is completely removed.
4. Quality control of the installation of pins and wedges. In order to improve the integrity of the formwork, the installation of pins and wedges should be strictly controlled.
5. Strengthen the acceptance system. In addition to the conventional acceptance standards for aluminum formwork, the process acceptance should be strictly controlled in combination with the actual project.
6. During the concrete pouring, workers are sent to check the formwork and solve problems as soon as possible. Mainly track whether the nuts of the through-wall screws are loose, whether the pins are loose, and whether there is a partial mold explosion. When the formwork is installed and during the concrete pouring process, the extreme difference of the formwork top plate should be checked and reviewed, and the excessive points should be adjusted in time.
7. Formwork removal quality control. The high price and high reuse rate are its unique characteristics. Its biggest disadvantage is that the formwork is replaced during construction and production after customization, which not only easily causes quality risks, but more importantly, affects the construction period (especially special-shaped customized formwork). Therefore, it is the responsibility of every construction worker to take care of the aluminum alloy formwork. During the installation process, the formwork surface cannot be directly hit with a hammer. When removing the formwork it cannot be pried hard to prevent the formwork from deformation, and it is not allowed to remove the formwork for profit because of time. The formwork should be removed according to the principle of removing only one piece at a time to ensure that the formwork is placed steadily on the ground.

Our Factory:


Products:


Packing& Shipping:
● Package
1. We will check the product to ensure the quality, then start packing and provide pictures and videos for your reference.
2. Depending on the size and quantity of the product, we will pack the product in wooden boxes or wooden racks.
3. We will provide you with pictures after packing.
● Shipping
1. We will give you the corresponding shipping plan for your reference according to the address you provided
2. We will follow up with the freight forwarder and track until you receive the goods.

Hot Tags: aluminum formwork short pole, China aluminum formwork short pole manufacturers, suppliers, aluminium formwork separable accessories, aluminium formwork retrofit accessories, aluminium formwork acrylic resin accessories, aluminium formwork phenolic resin accessories, aluminium formwork methodical accessories, formwork supports for aluminium
|
Brand |
Hualv |
|
Grade |
6061 Aluminum |
|
Application |
Commercial or industrial; modern and sophisticated building project; concrete Construction |
|
Place of Origin |
Shandong |
|
Delivery Time |
15 days |
|
Port |
Qingdao, Shanghai |
|
Warranty |
According to the actual situation |
|
Samples |
For free |
|
MOQ |
2000 sqm |
|
Payment Terms |
30% deposit before production, and balance before shipment |
|
After-sale Service |
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts |
|
Project Solution Capability |
Graphic design, 3D model design, total solution for projects, Cross Categories Consolidation |
|